Catalog

Control cabinets

Steel meter switchboards of the REV series are used to install single- and three-phase electricity meters with a 16A/B main circuit breaker and a 2A single-phase circuit breaker for HDO switching and are intended for installation in outdoor pillars and solid walls. They are characterized by a durable surface finish, high-quality workmanship and easy and quick assembly. more
Detailed filtering
€
€
Country of origin
REV 10 control cabinet Code: REV.10.001 + REV.10.001-02
REV 10 control cabinet Code: REV.10.001 + REV.10.001-02

Rev10 switchboard - for single-tariff consumption. Steel sheet meter switchboards of the REV series are used to install single- and three-phase electricity meters with a 16A/B main circuit breaker and a 2A single-phase circuit breaker for HDO switching and are intended for installation in outdoor pillars and solid walls. They are characterized by durable surface treatment, high-quality processing and easy and quick assembly. The cabinet is delivered empty, the installation is individual as needed.

Country of origin
Switch cabinet REV 20 Code: REV20 + REV.20.001-02
Switch cabinet REV 20 Code: REV20 + REV.20.001-02

Rev20 switchboard - for 2 separate measurements or tariff measurements (day, night). Steel sheet meter switchboards of the REV series are used to install single- and three-phase electricity meters with a 16A/B main circuit breaker and a 2A single-phase circuit breaker for HDO switching and are intended for installation in outdoor pillars and solid walls. They are characterized by durable surface treatment, high-quality processing and easy and quick assembly. The cabinet is delivered empty, the installation is individual as needed.

Country of origin
Switch cabinet REV 22 Code: REV22 + REV22.001-02
Switch cabinet REV 22 Code: REV22 + REV22.001-02

Rev22 switchboard - for 2 separate two-tariff measurements (day, night). Steel sheet meter switchboards of the REV series are used to install single- and three-phase electricity meters with a 16A/B main circuit breaker and a 2A single-phase circuit breaker for HDO switching and are intended for installation in outdoor pillars and solid walls. They are characterized by durable surface treatment, high-quality processing and easy and quick assembly. The cabinet is delivered empty, the installation is individual as needed.

Steel meter switchboards of the REV series are used to install single- and three-phase electricity meters with a 16A/B main circuit breaker and a 2A single-phase circuit breaker for HDO switching and are intended for installation in outdoor pillars and solid walls. They are characterized by a durable surface finish, high-quality workmanship and easy and quick assembly.

Last viewed
Country of origin
Santana bench Code: KA-K1119
Santana bench Code: KA-K1119

Park bench with backrest. The steel frame of the bench is powder-coated or hot-dip galvanized. 60 x 8 mm construction. Wooden slats spruce wood, treated with 3x glaze. Anchoring by concrete or screws. Seat height 450 mm, bench width 1500 mm, depth 430 mm. The dimensions of the slats are 1500 x 1200 x 30 mm.

Can't find a suitable product?

Maybe you need a customized solution. Read about lean manufacturing.

Find out more